Tuesday, November 30, 2010
Sunday, November 28, 2010
70% completed
Week 4 and the place is 70% completed for a warm , minimalist interior design. It's starting to take shape and the ID & contractor have been trying their best to meet the dateline. Overall, very satisfy with the ID, will recommend to friends who are looking for an ID.
The dining area.
I love this light the minute I step into my ID office. Yes, I make my ID sell this light in his office to me. wahhahah. He has three, its okay to give me one of it.
The only complain I have now is the kitchen cabinet. The dish drainer is way too low!!! It is 10" more than its suppose to be. What am I suppose to put there once the table top is up, not even a toaster fit under it. We finally manage to get the ID to alter it, but I guess it will take a bit more time as they need to dismantle everything and send back to the workshop. Hope they can rush back in time.
We add a additional pull-out table top to give us more cooking space.
They use a hinge door to solve the corner door problem. But I have some issue with this area, what can I store there? It's going to be the damp place. *think*
The Master bedroom toilet.
The wardrobe from Closet design. Looking good.
My hidden headboard drawers to minimize the space to have side tables. But luck we didn't construct the side tables, there is hardly any walking space once the bed frame seats in.
The vanity in the bedroom.
We modify the design after seeing SJ's friend having the same vanity design. We add in storage space behind the mirror so that we can store our toothbrushes, etc.
The tv console in daylight.
The study room and its grey walls make it a cozy place to work and relax.
Tuesday, November 23, 2010
Day 2 of week 4 - Painting
Monday, November 22, 2010
Day 1 of week 4
The start of week 4 and the ID had did some progress. The classic doors for all room are up and most of the lighting too. For the first time, the floors are all lifted off from the cupboard that has been protecting them from the plastering.


SJ felt that the living room fan & light is abit cheapo looking and very dim. The spot light looks above the door looks like a security camera...


SJ felt that the living room fan & light is abit cheapo looking and very dim. The spot light looks above the door looks like a security camera...
Sunday, November 21, 2010
Week 3 of renovation
Week 3 and the progress is abit slow because they have to wait for the plastering to settle. The whole house is plasted and some of the electricity wiring are up.
Monday, November 15, 2010
After two weeks, The flooring are complete!!
The flooring are complete after two week of renovation (28 Oct - 14 Nov) . Its all cover up with cupboard so that they can start their plastering and painting for this week 3.
Master bedroom toilet - small and miserable.
A close-up look of the tiles in all the toilet. Very spa like, I love it.
The view from the masterbed room door
The view from the door of spare room, future children room
View from the door of the store room.
View from the door of the study room.
View from the window area in the spare room.
View from the door of masterbed room to the living room
View from the kitchen to the living room.
Common toilet. Another small toilet.
The kitchen & dinning area. The dinning area is level to the living room and the drop is the kitchen area.
The kitchen area.
Master bedroom toilet - small and miserable.